Skip to content

TAKEOFFS & BILL OF MATERIALS

From measured space
to a clearer estimate.

Connect drawing quantities to material assignments, coverage, and ordering units. See the basis behind every line before it goes into a proposal.

Cutaway limestone and timber residence on an architectural plan, with traced roof edges, exposed rooms and coordinated roofing, stone and timber samples
AREA / LENGTH / COUNTSOURCE → QUANTITY → MATERIAL → PRICE

THE REASON BEHIND EVERY LINE

Measured basis.
Real ordering logic.

Trace an area through coverage and waste into whole purchase units. Review the product assumptions before ordering.

01 / MEASUREsquare feet · sample input
×
02 / ALLOWpercent · editable assumption
03 / ORDER6 rolls400 ft² per roll · rounded up
2,140 × 1.10 ÷ 400 = 5.885 → 6 whole rollsConcept calculation, not a quotation.

BUSINESS CATALOG

Define once.
Choose per project.

Keep product specifications and assemblies in the tenant catalog. Create project copies so a choice on one property does not silently change another.

Internal costWhat it costs you.
Customer priceWhat the scope sells for.
MarginThe difference, made visible.

THE CONNECTED BUSINESS / CONTINUE EXPLORING

Nothing works
in isolation.

Capture, design, plan and deliver—with the property and the business in the same conversation.

01 / MATERIALS & ASSEMBLIESCONNECTED STUDY
Exploded wall assembly showing limestone, battens, membrane, insulated timber framing and plasterboard
A product. A system. A project-specific choice.UP / 01
Exploded wall assembly showing limestone, battens, membrane, insulated timber framing and plasterboard

Define product units and assembly templates once. Give each project its own reviewed material choices, quantities and pricing.

Explore materials & assemblies

FROM FIRST IMPRESSION TO FINAL PAYMENT

Your next chapter.
Starts with one project.